Uni Super
This was a single floor fit out in the Melbourne CBD, that was a complete refurbishment of there office space.  The floor consists of work stations, Meeting Rooms & large staff break out area.

Overall the works were completed on time with all of the clients requirements met.

The scope of works consisted of the following –

Power/Lighting

Disconnect and make safe of power.
Install soft-wiring cabling for all workstations.
Reconfigure lighting zones
Supply and installation of feature lighting in reception, boardrooms and meeting rooms
Supply and installation of Dynalite control and interface
Supply and installation of recessed floor-boxes
Modify existing switchboards to accommodate RCD circuit breakers in accordance with Australian Standards.
The full Dynalite lighting control system was designed and installed to operate all lighting throughout the offices. This system is controlled through time control, motion detection and PE cell operation. The system consists of networks linked via an Ethernet backbone to a computer housed in the Communications room.
The system allows the user to control, monitor and adjust time schedules to suit the client’s needs. Building floor plans and site plans have been used to generate a graphical representation of the office and provide accurate, real-time status of lighting levels. The lighting control system is also interfaced with the security system for simultaneous third party control.

Product Detail Image
Product Detail Image
Product Detail Image

Get In Touch With Us





(*) Required Field

Locate Us